term scheduling backward help what is
Meaning of backward scheduling (PP). What is it: are scheduled backwards starting from the order.

Helpful?

Definition backward scheduling (PP)

BACKWARD SCHEDULING (PP) title: backward scheduling (PP) (SAP Library - Glossary)
BACKWARD SCHEDULING (PP) category: Production Planning and Control (PP)
BACKWARD SCHEDULING (PP) explained:

A type of scheduling in which the operations of an order are scheduled backwards starting from the order due date.

The scheduled start and scheduled finish of the order are determined using this scheduling type.

More terms such as backward scheduling (PP) in Dictionary B.

Manual Business Scenario (SV-ASA):
Help the flow of business processes according to a business typology. A business scenario represents a template for a business process, which runs within a particular area of a company process. All backward scheduling (pp) definition.
Manual Benefits Entitlement:
Help insured in statutory health insurance to a medically required service. For example, in the area of dental restoration, insureds are entitled to medically required crowns and dental restoration. In backward scheduling (pp) explain.
Manual Borrowing Period:
Help Period for which a medical record is borrowed backward scheduling (pp) what is.
Manual Bench Scale Trial:
Help A trial, in which small quantities of a product are produced. The main aim of the trial is to develop prototypes and to supply a provisional formula or recipe for subsequent pilot plant trials backward scheduling (pp) meaning.
Manual Bitmap:
Help A field of pixel values or a raster image that is usually rectangular backward scheduling (pp) abbreviation.
  • Dodano:
  • Autor: