DEALLOCATE (SCM-APO-PPS) title: deallocate (SCM-APO-PPS) (SAP Library - Glossary)
DEALLOCATE (SCM-APO-PPS) category: Production Planning and Detailed Scheduling (SCM-APO-PPS)
DEALLOCATE (SCM-APO-PPS) explained:
Detailed scheduling activity in which an operation is removed from the resource schedule.
With deallocation, an operation is given the status deallocated; the operation no longer occupies any resources.
More terms such as deallocate (SCM-APO-PPS) in Dictionary D.
- Manual Documentation Object:
- Help A category for texts or text-like objects such as graphics. The following documentation objects are found in Customizing: Hierarchy structure Project documentation IMG documentation deallocate (scm-apo-pps) definition.
- Manual Dynamic Storage Bin:
- Help logical or physical storage type that is identified by the document number that caused the movement. Example When you specify in a movement type that an interim storage type has dynamic coordinates deallocate (scm-apo-pps) explain.
- Manual Document Linking:
- Help The linking of documents that results when purchase requisitions are forwarded deallocate (scm-apo-pps) what is.
- Manual Database Selector:
- Help list in the Query Editor UI for choosing a specific database management system (DBMS). Choosing the database management system (DBMS) associated with a linked server (selected using the linked deallocate (scm-apo-pps) meaning.
- Manual Date-Specific Booking Unit:
- Help assignment to an edition and/or whose content on a specific date differs from the assignment to an issue variant type defined in the booking unit. Date-specific booking units are created if ads in a deallocate (scm-apo-pps) abbreviation.