DEVELOPMENT SYSTEM (BC-CUS-TOL) title: development system (BC-CUS-TOL) (SAP Library - Glossary)
DEVELOPMENT SYSTEM (BC-CUS-TOL) category: Customizing Tools (Techniques) (BC-CUS-TOL)
DEVELOPMENT SYSTEM (BC-CUS-TOL) explained:
The SAP transaction where development and Customizing work is performed.
From here, the system data can be transferred to the quality assurance system.
More terms such as development system (BC-CUS-TOL) in Dictionary D.
- Manual Domain Link:
- Help different transport domains. A domain link enables the following: Transparent access to all linked systems Display of import queues in all systems Configuration of transport routes between systems in development system (bc-cus-tol) definition.
- Manual Detailed Navigation IView:
- Help iView in which the detailed navigation runs in the portal. The Detailed Navigation iView appears in the navigation panel development system (bc-cus-tol) explain.
- Manual Depot (LO):
- Help that is dedicated to the storage and sale of goods, as opposed to a manufacturing plant. Depots: Do not participate in the CENVAT scheme Are required to keep a register of all goods receipts and development system (bc-cus-tol) what is.
- Manual Dependent Eligibility Rule:
- Help determining that a certain type of family member is permitted as a dependent for a plan. The types of family member are represented by the subtype of the Family/Related Person infotype (0021). By development system (bc-cus-tol) meaning.
- Manual Dependent Requirement (PP-MRP):
- Help material requirements that are caused by the production of higher-level assemblies. In the MRP procedure, dependent requirements are automatically created for the components that are necessary for development system (bc-cus-tol) abbreviation.