LONG-LEAD ITEM title: long-lead item (IS-AD) (SAP Library - Glossary)
LONG-LEAD ITEM category: Aerospace & Defence Industry Solution (IS-AD)
LONG-LEAD ITEM explained:
A material where the elapsed time from order to delivery is so large that special planning and often contractual provisions are required to ensure the availability to a given schedule. In project-based manufacturing, the procurement of long lead items is initiated in an early project phase prior to completion of the final product design. These materials can be complicated assemblies requiring design or engineering effort, e.g an aircraft wing, or raw materials that require sophisticated manufacture e.g. specialist metals.They are generally procured as make-to-order items and are not generally held as in stock material.
More terms such as long-lead item in Dictionary L.
- Manual Lump Sum Budget Or Plan:
- Help value or budget value for asset acquisitions. These plan values or budget values are overall estimates for a specific period of time, rather than being related to specific individual acquisitions long-lead item definition.
- Manual Line Of Business:
- Help area in a company (division) which combines all responsibilities for a particular product or group. Risks of a similar nature are grouped together in a line of business and, in an insurance context long-lead item explain.
- Manual Length Plan:
- Help lengths determined in the length calculation for each operation, including item and scrap data. The table also displays the component quantities that are affected by the length calculation long-lead item what is.
- Manual Lower-Level Costs:
- Help The costs in a costing that, occurred in the previous levels of the production structure, from the viewpoint of the current level long-lead item meaning.
- Manual Layer Pattern Of A Packaging Material:
- Help material per layer and packaging material. The layer pattern is used to create optimized packing patters for the packaging material, ensuring that the layers are as full as possible long-lead item abbreviation.