term planning size help what is
Meaning of lot size planning. What is it: requirements (forecast requirements, customer.

Helpful?

Definition lot size planning

LOT SIZE PLANNING title: lot size planning (SCM-APO-SNP) (SAP Library - Glossary)
LOT SIZE PLANNING category: Supply Network Planning (SNP) (SCM-APO-SNP)
LOT SIZE PLANNING explained:

Planning procedure that generates receipts based on requirements (forecast requirements, customer requirements, secondary requirements, and distribution requirements), and then groups these receipts into larger production quantities. This reduces setup costs and setup times, for example, or optimizes use of bottle neck resources. It is possible to produce quantities over several periods. If a product can be produced by the same production process model (PPM) as the previous period, potential setup activities will be omitted.

There is a lower level of lot size planning in the process industry (rough-cut planning) for campaign planning in Production Planning and Detailed Scheduling (PP/DS).

More terms such as lot size planning in Dictionary L.

Manual Local Object:
Help created for private use. Local objects belong to the development class $TMP. They are not transported to other systems. You can access the local objects of other users as well as your own lot size planning definition.
Manual Lifetime Dose:
Help Is used to determine the dose of a drug which a patient may be administered in his lifetime lot size planning explain.
Manual Line Representation Selection:
Help A decision function for selecting a line in the table area of a planning table lot size planning what is.
Manual Lock Table:
Help the main memory of the enqueue server which contains entries for the current locks in the system. Each lock includes the owner of the lock, the lock mode, and the name and the fields of the locked lot size planning meaning.
Manual List Event:
Help runtime environment that occurs during list processing. The corresponding event keywords are TOP-OF-PAGE, END-OF-PAGE , as well as AT LINE-SELECTION, AT-USER-COMMAND and the now obsolete AT PFnn lot size planning abbreviation.
  • Dodano:
  • Autor: