term cost actual help what is
Meaning of net actual cost. What is it: actual cost is compared to the target cost to determine.

Helpful?

Definition net actual cost

NET ACTUAL COST title: net actual cost (CO-PC) (SAP Library - Glossary)
NET ACTUAL COST category: Product Cost Controlling (CO-PC)
NET ACTUAL COST explained:

The actual cost less the work in process and scrap.

The net actual cost is compared to the target cost to determine production variances and total variances.

More terms such as net actual cost in Dictionary N.

Manual Network View:
Help the DS planning board in which the position of operations or orders at the resources and the relationships between these objects (time relationships or pegging relationships) are displayed net actual cost definition.
Manual Negative Lead-Time Offset:
Help the planned start date using a planned order's planned finish date in MRP. This means that it is known when the dependent requirements are needed at all subsequent BOM explosions. This means net actual cost explain.
Manual Non-Valuated Stock:
Help material held and owned by a company that is managed on a quantity basis only. Non-valuated stock is available but can only be withdrawn from the stores or warehouse after it is transferred to net actual cost what is.
Manual Non-Repudiation (BC-SEC):
Help deny having performed an action. This is important as electronic messages and documents can be easily copied or changed. Therefore, in case of dispute, we need a means to prove that the alleged net actual cost meaning.
Manual Node (IS-T):
Help integrated contract and order manager (ICOM) that refers to an object in the standard R/3 System. This can be either a business object (such as an order item) or a technical object (such as equipment net actual cost abbreviation.
  • Dodano:
  • Autor: