term shift working help what is
Meaning of non-working shift. What is it: zero planned working hours that represents a day off.

Helpful?

Definition non-working shift

NON-WORKING SHIFT title: non-working shift (PT) (SAP Library - Glossary)
NON-WORKING SHIFT category: Personnel Time Management (PT)
NON-WORKING SHIFT explained:

A daily work schedule, in a multiple-shift operation, with zero planned working hours that represents a day off.

More terms such as non-working shift in Dictionary N.

Manual Nursing Service:
Help Service which is performed in nursing care. Nursing services are technically assigned to a nursing anchor service non-working shift definition.
Manual Nominal Load:
Help Average load for which a meter is designed under normal operating conditions non-working shift explain.
Manual Negative Lead Time:
Help before the production start date for a higher-level assembly when a lower-level component must be made available. Lead time - positive value Components can be obtained after production starts. Lead non-working shift what is.
Manual Normalization Form:
Help Unicode normalization forms defined in the Unicode Standard Annex15: normalization form C (NFC): results from the canonical decomposition of a Unicode string, followed by the replacement of all non-working shift meaning.
Manual Name Range:
Help A subset of a namespace. Typically, a name range is defined by an interval within a namespace. Instead of an interval, you can also specify a generic string non-working shift abbreviation.
  • Dodano:
  • Autor: