OPENING PERIOD FOR PLANNED ORDER title: opening period for planned order (PP-MRP) (SAP Library - Glossary)
OPENING PERIOD FOR PLANNED ORDER category: Material Requirements Planning (PP-MRP)
OPENING PERIOD FOR PLANNED ORDER explained:
The number of working days between the date that the order is created and the planned start date.
This time is available for the MRP controller to convert a planned order into a purchase requisition or a production order.
More terms such as opening period for planned order in Dictionary O.
- Manual Other Elimination Difference (EC-CS):
- Help incurred during interunit elimination when a consolidation unit and its partner unit portray their business relationships in their individual financial statement records in different ways. Reasons opening period for planned order definition.
- Manual Operator Inspection:
- Help Part of the quality inspection required for quality control purposes that is carried out by the operator opening period for planned order explain.
- Manual Object Information:
- Help which affects the reference object for the notification or order and that can be displayed from the notification or order. This data can consist of the following: Structure data (for example, object opening period for planned order what is.
- Manual Object Relationship (FS-BA-SD):
- Help different types of unidirectional relationships between independent objects. These relationships can be managed under a single relationship category, which is time-dependent. Unidirectional opening period for planned order meaning.
- Manual Overhead Costing:
- Help method of costing cost objects in Cost Object Controlling (CO-PC-OBJ). This method first assigns the direct costs from Cost Element Accounting (CO-OM-CEL) to the cost object. Prorated overhead costs opening period for planned order abbreviation.