OPERATIONAL DATE title: operational date (IS-R) (SAP Library - Glossary)
OPERATIONAL DATE category: Retail (IS-R)
OPERATIONAL DATE explained:

A planned event, which if postponed would have an effect on all subsequent events.

Operational dates are milestones in the physical movement of goods.

More terms such as operational date in Dictionary O.

Manual One-Time Demand:
Help off or rare maintenance events, because of an Airworthiness Directive or similar. Once created, a one-time demand is no different to any other demand, however, it does have a very low priority and is operational date definition.
Manual Overhead Structure:
Help defines the rules for the calculation of the values to be posted. An overhead structure consists of one or more of the following rows: Base row - Contains the amount used as a basis for the overhead operational date explain.
Manual Organizational Plan (PA-OS):
Help types of information that provide a view of the structural and human resource environment in your enterprise. An organizational plan includes information about the: Organizational structure in your operational date what is.
Manual One-Step Production Confirmation:
Help executing the production backflush: The system reads all open backflushes and corresponding components. The components are sorted according to posting date and assigned to product cost collectors operational date meaning.
Manual Object Relation:
Help characteristic of an object relationship with fixed objects, where one is the parent object and the other the child object. Within an object relationship, object relations can be created between operational date abbreviation.
  • Dodano:
  • Autor: