term resource other help what is
Meaning of other resource (PE). What is it: and instructors. If your system is not integrated with.

Helpful?

Definition other resource (PE)

OTHER RESOURCE (PE) title: other resource (PE) (SAP Library - Glossary)
OTHER RESOURCE (PE) category: Training and Event Management (PE)
OTHER RESOURCE (PE) explained:

A resource type that includes all resources except rooms and instructors.

If your system is not integrated with the Materials Management component and you do not have access to the materials stored in the material master data record, you can use this resource type as an alternative to the resource type material. There is no integration needed for this resource type.

Example

Training materials, PCs.

More terms such as other resource (PE) in Dictionary O.

Manual Ok Field:
Help dynpro field that is not linked with a screen element. When a user action occurs on a control element that is linked to a function code, the function code is put in the ok field and is passed to a other resource (pe) definition.
Manual Order Group (SCM-APO-SNP):
Help orders that can be both header orders and suborders. Order groups are used by SNP aggregation and disaggregation in aggregated planning to aggregate orders to a header order or to disaggregate other resource (pe) explain.
Manual Operation (SCM-APO-MD):
Help Description of an action within a PPM plan. An operation can consist of numerous activities other resource (pe) what is.
Manual Operation Scrap:
Help The percentage of the material processed in an operation that does not meet quality requirements. Operation scrap is entered in the routing or in the bill of material other resource (pe) meaning.
Manual Order (IS-HMED):
Help physician determines which drug should be administered to a patient. He also defines the quantity of the drug, the frequency of administration, the administration times, and the duration of the other resource (pe) abbreviation.
  • Dodano:
  • Autor: