RELATIONSHIP (PP-PI) title: relationship (PP-PI) (SAP Library - Glossary)
RELATIONSHIP (PP-PI) category: Production Planning for Process Industries (PP-PI)
RELATIONSHIP (PP-PI) explained:
The linking between the start and finish points of phases in a master recipe or process order.
Relationships determine the sequence of phases in terms of time.
Types of relationships are:
SS relationship (Start - Start) FF relationship (Finish - Finish) SF relationship (Start - Finish) FS relationship (Finish - Start)More terms such as relationship (PP-PI) in Dictionary R.
- Manual Reference Material (LO-MD):
- Help A material whose master data is copied by the system as default values for creating a new material relationship (pp-pi) definition.
- Manual Restart Log:
- Help converting a table. If the conversion is successful, the log is deleted automatically when the conversion has finished. If the conversion terminates because of an error, you can locate the point of relationship (pp-pi) explain.
- Manual Return Storage Type:
- Help remain after the required quantity is picked, when stock is removed from a storage type for which complete pick is defined. The remaining quantity is returned to a storage bin in what is called a relationship (pp-pi) what is.
- Manual Rights Dimension Combination:
- Help Describes the combination of rights dimensions (e.g. market and language) defined in the Implementation Guide, which is valid for each client relationship (pp-pi) meaning.
- Manual Receivable Component:
- Help The component of a receivable (such as capital, outstanding interest or fees) which is to be collateralized relationship (pp-pi) abbreviation.