CAPACITY LOAD title: capacity load (PP-CRP) (SAP Library - Glossary)
CAPACITY LOAD category: Capacity Requirements Planning (PP-CRP)
CAPACITY LOAD explained:
A value that is determined from a comparison of capacity requirements for a specific capacity category and the capacity available.
This value is specified as a percentage of available capacity.
More terms such as capacity load in Dictionary C.
- Manual Cumulation Interval:
- Help wage type values are added together. These values are stored in the Number and/or Amount fields of a wage type. They are cumulated between the valid from date and valid to date of the cumulation capacity load definition.
- Manual Configuration Task:
- Help the whole configuration process. At any given point in time, SAP Internet Pricing and Configurator handles exactly one task. Dependency nets are grouped together using tasks: During the processing of capacity load explain.
- Manual Contract Template (IS-U-CS):
- Help Template, used to determine the master data templates for creating a contract in the accelerated move-in / move-out / move-in/out entry capacity load what is.
- Manual CUIT Number:
- Help A tax number assigned, in Argentina, by the federal tax authorities to large companies. CUIT stands for clave única de identificación tributaria capacity load meaning.
- Manual Closed-Loop Scenario (IS-AD-ROT):
- Help also known as Remove-Rework-Install in the Maintenance Repair and Overhaul (MRO) process. An unserviceable part is removed from a technical object (such as aircraft), inspected and repaired capacity load abbreviation.