term costing help what is
Meaning of costing run. What is it: materials at the same time. In Product Cost Planning, costing.

Helpful?

Definition costing run

COSTING RUN title: costing run (CO-PC) (SAP Library - Glossary)
COSTING RUN category: Product Cost Controlling (CO-PC)
COSTING RUN explained:

A tool that provides the opportunity to cost multiple materials at the same time.

In Product Cost Planning, costing runs are used to cost materials based on planning data. This type of costing run is based on a user-defined name and a date.

In Actual Costing/Material Ledger, costing runs are used to cost materials with actual data. This type of costing run is based on a costing run profile and a period.

More terms such as costing run in Dictionary C.

Manual Cross-Delivery Handling Unit:
Help Physical unit that packages products from multiple deliveries costing run definition.
Manual Cache Group:
Help options for cache objects within a cache region. A cache object can be assigned only to one cache group. Each cache group has one element configuration that can be different from the element costing run explain.
Manual Cliff Vesting:
Help A form of vesting that implies that for example all awards vest at once after two years costing run what is.
Manual Calculation Based On Premium:
Help Calculation of the sum insured, based on the premium specified by the policyholder costing run meaning.
Manual Continuous Occupancy:
Help The actual usage of a reservation object, such as a room, by one or more persons or the presence of equipment costing run abbreviation.
  • Dodano:
  • Autor: