ENGINEERING CHANGE ORDER title: engineering change order (XAP-CQM) (SAP Library - Glossary)
ENGINEERING CHANGE ORDER category: Cost and Quotation Management (SAP xCQM) (XAP-CQM)
ENGINEERING CHANGE ORDER explained:
A customer-initiated change that impacts a product already in a productive environment.
More terms such as engineering change order in Dictionary E.
- Manual Explanatory Text:
- Help A control element in the work area of a window. Explanatory texts are text output fields that can follow input or output fields to describe the contents engineering change order definition.
- Manual Event (BW):
- Help Signal to background processing system that a certain status has been reached in the SAP system. The background processing system then starts all processes waiting for this event engineering change order explain.
- Manual Emergency Dataset Part II:
- Help This dataset part exists only during a get emergency dataset command. It is dynamically created from the medication history table and lists the current medications engineering change order what is.
- Manual Expired Vendor:
- Help to do business with the United States government must register with Central Contractor Registration (CCR) and renew that registration annually. The status expired is applied to suppliers whose engineering change order meaning.
- Manual Expense Receipt:
- Help receipt or invoice, that an employee submits to their company in order to have their travel expenses reimbursed. Travel expenses can be reimbursed: Using flat rate/per diem reimbursement (meals per engineering change order abbreviation.