FLOAT BEFORE PRODUCTION title: float before production (PP-CRP) (SAP Library - Glossary)
FLOAT BEFORE PRODUCTION category: Capacity Requirements Planning (PP-CRP)
FLOAT BEFORE PRODUCTION explained:
The number of working days between the order start date and the scheduled start date; used as a float in production scheduling.
More terms such as float before production in Dictionary F.
- Manual Functional Location Label:
- Help A label that uniquely identifies a functional location. It consists of the primary label and all other alternative labels available for this functional location float before production definition.
- Manual FORCER Framework:
- Help Technical framework for mapping assignments of specific object types to objects that are based on HR object types float before production explain.
- Manual Forecast Date:
- Help The dates in the project indicating when you expect to perform activities and WBS elements float before production what is.
- Manual Form I-20:
- Help Form certifying a foreign student's admission to a program of study at an authorized educational institution float before production meaning.
- Manual Follow-On License:
- Help License that is used after the maximum quantity for the first license has been reached float before production abbreviation.