term forecast help what is
Meaning of forecast (MM-PUR). What is it: irrespective of whether this requirement has previously.

Helpful?

Definition forecast (MM-PUR)

FORECAST (MM-PUR) title: forecast (MM-PUR) (SAP Library - Glossary)
FORECAST (MM-PUR) category: Purchasing (MM-PUR)
FORECAST (MM-PUR) explained:

A quantity of a material that is required in the future, irrespective of whether this requirement has previously been transmitted to the vendor.

The schedule line type "forecast" represents an anticipated future requirement. There are two other types of schedule line: "backlog" (a past requirement that has already been transmitted but for which no goods have yet been delivered) and "immediate requirement" (representing an immediate need that has not yet been transmitted to the vendor).

More terms such as forecast (MM-PUR) in Dictionary F.

Manual Function Text:
Help A short description of a function forecast (mm-pur) definition.
Manual Force Provider:
Help The force element that equips an operational or exercise force element forecast (mm-pur) explain.
Manual Formula Repository:
Help Words and concepts used in formula and average pricing are stored in the formula repository, to reduce the time needed for entering formulas which are needed repeatedly forecast (mm-pur) what is.
Manual Finding (CA-QIE):
Help Describes how something deviates from the requirements. The deviations were determined during an inspection forecast (mm-pur) meaning.
Manual Fixtures And Fittings (RE):
Help The inventory and the condition of real estate using fixtures and fittings characteristics forecast (mm-pur) abbreviation.
  • Dodano:
  • Autor: