term split cost initial help what is
Meaning of initial cost split. What is it: separate cost components for all procurement costs, such.

Helpful?

Definition initial cost split

INITIAL COST SPLIT title: initial cost split (CO-PC) (SAP Library - Glossary)
INITIAL COST SPLIT category: Product Cost Controlling (CO-PC)
INITIAL COST SPLIT explained:

A cost component split for raw materials, which contains separate cost components for all procurement costs, such as:

Purchase price Freight charges Insurance contributions Administration costs

More terms such as initial cost split in Dictionary I.

Manual Indirectly Assigned BOM:
Help assigned in the technical object using the construction type. If a material number is entered in the master record as the constructiontype, then this material BOM is indirectly assigned to the initial cost split definition.
Manual Interlinking Action:
Help of two or more elementary actions that have been linked to each other. When the interlinking action is started all elementary actions are carried out automatically in the predefined sequence. The initial cost split explain.
Manual Infinite Sequencing:
Help enabling the system to reschedule just the operations you have selected together with their dependent operations. The selected operations are scheduled on the resource for the desired date/time initial cost split what is.
Manual Input/Output Field:
Help fields are fields where the system displays data, or where users can enter data. In SAP GUI, an input/output field is a screen element that is bound to a screen field. It represents the content of initial cost split meaning.
Manual Interface Type:
Help attribute, method, and event definitions, used in a common context. An object type can support one or more interface types. The attributes, methods, and events already defined in the interface types initial cost split abbreviation.
  • Dodano:
  • Autor: