term interim portfolio what is
Meaning of interim portfolio assignment (ICM). What is it: a limited period of time. However, if.

Helpful?

Definition interim portfolio assignment (ICM)

INTERIM PORTFOLIO ASSIGNMENT (ICM) title: interim portfolio assignment (ICM) (SAP Library - Glossary)
INTERIM PORTFOLIO ASSIGNMENT (ICM) category: Incentive & Commission Management, Portfolio Assignment (ICM)
INTERIM PORTFOLIO ASSIGNMENT (ICM) explained:

A portfolio that is assigned to a commission recipient for a limited period of time.

However, if the commission recipient succeeds in changing the contract terms in an interim portfolio assignment, this contract is assigned correctly to his or her portfolio (segment).

More terms such as interim portfolio assignment (ICM) in Dictionary I.

Manual Interactive Offline Form:
Help data entry by a user who is not connected to an SAP system. The user can use Adobe Reader or Adobe Acrobat to open and complete the form. The form is then submitted back to the SAP system. The interim portfolio assignment (icm) definition.
Manual Insert Block:
Help Block of source code lines to be inserted in correction instructions. They are listed after the context block, and after any delete block interim portfolio assignment (icm) explain.
Manual Inclusive Rule:
Help Object of the rules-based availability check that is used to determine substitute products and substitute locations interim portfolio assignment (icm) what is.
Manual ISO Currency Code:
Help A unique three-letter code defined by ISO standard 4217:1995 that represents a particular currency interim portfolio assignment (icm) meaning.
Manual Interim Status:
Help in the process Changing an Equipment History . When the actual history is replaced by the target history, the system automatically creates an interim status. When it creates an interim status, the interim portfolio assignment (icm) abbreviation.
  • Dodano:
  • Autor: