LEAD TIME (PSM-FG) title: lead time (PSM-FG) (SAP Library - Glossary)
LEAD TIME (PSM-FG) category: Functions for U.S. Federal Government (PSM-FG)
LEAD TIME (PSM-FG) explained:
Number of days prior to the end date.
Each process type can have different sets of lead times. For example, the expiration of probation can have 90-60-30 set of lead times while the step change can have 180-120-90 set of lead times. The lead times depend solely on the process type and not on the process subtype.
More terms such as lead time (PSM-FG) in Dictionary L.
- Manual Local Currency (FI-LC):
- Help The currency of a company that belongs to a corporate group. If the local currency is not the same as the group currency, the local currency must be translated into the group currency lead time (psm-fg) definition.
- Manual Lower-Level Costs:
- Help The costs in a costing that, occurred in the previous levels of the production structure, from the viewpoint of the current level lead time (psm-fg) explain.
- Manual Loading Data:
- Help Data that is transferred from a Terminal Automation System (TAS-System) to the SAP system lead time (psm-fg) what is.
- Manual Learner Account:
- Help for a learner that includes the following attributes: Planned, in process and completed course bookings Planned, in process and completed courses Function-related and person-related qualification lead time (psm-fg) meaning.
- Manual LIFO:
- Help An approach used in the LIFO withdrawal method and the LIFO valuation procedure. LIFO stands for last in, first out lead time (psm-fg) abbreviation.