LONG-LEAD ITEM title: long-lead item (IS-AD) (SAP Library - Glossary)
LONG-LEAD ITEM category: Aerospace & Defence Industry Solution (IS-AD)
LONG-LEAD ITEM explained:
A material where the elapsed time from order to delivery is so large that special planning and often contractual provisions are required to ensure the availability to a given schedule. In project-based manufacturing, the procurement of long lead items is initiated in an early project phase prior to completion of the final product design. These materials can be complicated assemblies requiring design or engineering effort, e.g an aircraft wing, or raw materials that require sophisticated manufacture e.g. specialist metals.They are generally procured as make-to-order items and are not generally held as in stock material.
More terms such as long-lead item in Dictionary L.
- Manual Login Module Stack:
- Help modules containing authentication logic that is assigned to a component. When a user is authenticated on the J2EE Engine, the server sequentially processes the login module stack that applies to the long-lead item definition.
- Manual List Processing:
- Help In the ABAP runtime environment, encapsulated processing of a screen list for which the screen event PAI is passed on to the ABAP program in form of list events long-lead item explain.
- Manual Lot (PP-MRP):
- Help A quantity that is received to stock or produced in one production run, and that has the same production costs and specifications long-lead item what is.
- Manual Lowest Value Comparison:
- Help which the preliminary results of LIFO or FIFO valuation (gross value) are compared with a value obtained using the lowest value determination procedure. (LIFO stands for last in, first out , FIFO for long-lead item meaning.
- Manual Last Screen:
- Help Standard R/3 function, which you use to call the last screen of a fixed chain of screens long-lead item abbreviation.