LONG-TERM PLANNED ORDER title: long-term planned order (PP-MRP) (SAP Library - Glossary)
LONG-TERM PLANNED ORDER category: Material Requirements Planning (PP-MRP)
LONG-TERM PLANNED ORDER explained:
A long-term planned orders are simulative planned orders that are used in long-term planning.
These planned orders are created in the long-term planning run. You can create them manually. You can copy planned orders from operative planning to long-term planning. They are converted to simulative planned orders that can be processed in long-term planning.
More terms such as long-term planned order in Dictionary L.
- Manual Listener (BC-FES-GRA):
- Help elements in the architecture of the IGS. It receives data packets from a data source (for example, R/3) and sends them to a multiplexer. The multiplexer communicates with a port watcher, which in long-term planned order definition.
- Manual Link (CRM-MD-PRO-OBJ):
- Help Link to a sales or other document. The link is stored in the event history and allows to directly call up the document from the history long-term planned order explain.
- Manual Link (EP-KM-CM):
- Help folder that creates a connection to another object. In KM folders users can use links to open target objects stored in other locations. A link gives the path or address of a target object. The name long-term planned order what is.
- Manual Leading Order:
- Help The highest superior order in an order hierarchy long-term planned order meaning.
- Manual Late Storing With Bar Codes:
- Help Storage strategy in which incoming documents are provided with a bar code at the start of processing. They are scanned and stored after they have been entered in the SAP system long-term planned order abbreviation.