LOW-LEVEL CODE title: low-level code (PP-MRP) (SAP Library - Glossary)
LOW-LEVEL CODE category: Material Requirements Planning (PP-MRP)
LOW-LEVEL CODE explained:
The lowest level that a material appears in a product structure.
More terms such as low-level code in Dictionary L.
- Manual Loss Creation:
- Help The value created to date by results analysis on the basis of the planning data. A loss creation is calculated by results analysis when the Percentage of Completion method is used low-level code definition.
- Manual Line-Of-Business Application:
- Help An application that is vital to running enterprises, such as payroll, resource planning, supply chain management, and accounting low-level code explain.
- Manual Land Quality Indicator:
- Help value of agricultural land various factors are measured: the soil texture, soil condition and the geological origin of the soil (parent material). Soil classification numbers are determined as part low-level code what is.
- Manual Lead Time (IS-B-RA-MR):
- Help Contractually agreed period of time between the buyer's notification of his/her wish to exercise the option, and the actual exercising of a Bermuda option low-level code meaning.
- Manual Lowest Value Comparison:
- Help which the preliminary results of LIFO or FIFO valuation (gross value) are compared with a value obtained using the lowest value determination procedure. (LIFO stands for last in, first out , FIFO for low-level code abbreviation.