MAINTENANCE CALL DATE title: maintenance call date (PM) (SAP Library - Glossary)
MAINTENANCE CALL DATE category: Plant Maintenance (PM)
MAINTENANCE CALL DATE explained:
A date on which the system generates a maintenance call object for a maintenance plan, for example, a maintenance order or a service entry sheet.
The system calculates the maintenance call date based on the call horizon and the cycle modification factor.
More terms such as maintenance call date in Dictionary M.
- Manual MRP Planning Run:
- Help an MRP heuristic. An MRP heuristic is a service heuristic that is based on the algorithm /SAPAPO/HEUR_MRP_PLANNING. The task of the MRP heuristic is to control the planning of selected products. As a maintenance call date definition.
- Manual Media Player:
- Help A computer program used to hear and view audio and visual files maintenance call date explain.
- Manual Master Data Hierarchy:
- Help A hierarchy that is stored in the characteristic repository of Bank Analyzer, and based on the master data of a characteristic maintenance call date what is.
- Manual More Than One Day:
- Help used in evaluating time data records and as a criterion for differentiating between time data records during collision checks. The end date for time information is after the start date. Example You maintenance call date meaning.
- Manual Move-In Date (IS-U-CS):
- Help billing-related aspects of the contract with the customer begin. The move-in date is the scheduled date for the meter reading at move-in and for the next billing period. The move-in date (as entered maintenance call date abbreviation.