Definition maximum lot size (SCM-APO-PPS)

MAXIMUM LOT SIZE (SCM-APO-PPS) title: maximum lot size (SCM-APO-PPS) (SAP Library - Glossary)
MAXIMUM LOT SIZE (SCM-APO-PPS) category: Production Planning and Detailed Scheduling (SCM-APO-PPS)
MAXIMUM LOT SIZE (SCM-APO-PPS) explained:

Quantity that must not be exceeded during procurement.

The maximum lot size can be taken into consideration during the procurement quantity calculation.

More terms such as maximum lot size (SCM-APO-PPS) in Dictionary M.

Manual Maintenance Call Date:
Help system generates a maintenance call object for a maintenance plan, for example, a maintenance order or a service entry sheet. The system calculates the maintenance call date based on the call maximum lot size (scm-apo-pps) definition.
Manual Monitor (GRC):
Help A person who watches a particular mitigation control. They must run certain reports to oversee the mitigation controls maximum lot size (scm-apo-pps) explain.
Manual MapBox:
Help on a J2EE platform for data synchronization with mobile devices and groupware solutions. XSLT mapping rules provide for a reduction of data from backoffice systems to suit the format of mobile maximum lot size (scm-apo-pps) what is.
Manual MRP Lot Size:
Help A key that defines which lot-sizing procedure the system uses for calculating the quantity to procure in the MRP run maximum lot size (scm-apo-pps) meaning.
Manual Maintenance Plan Scheduling:
Help creating call dates in a maintenance plan. Maintenance call objects, for example, maintenance orders or service entry sheets, are generated for these call dates at a later date. Depending on the type maximum lot size (scm-apo-pps) abbreviation.
  • Dodano:
  • Autor: