Definition midpoint scheduling

MIDPOINT SCHEDULING title: midpoint scheduling (PP) (SAP Library - Glossary)
MIDPOINT SCHEDULING category: Production Planning and Control (PP)
MIDPOINT SCHEDULING explained:

A scheduling type in which an order is rescheduled based on changes to dates:

Starting from the start time of the operation, all previous operations are scheduled backwards. Starting from the finish time of the operation, all previous operations are scheduled forwards.

This type of scheduling is used, for example, in production planning and control when the operation dates are changed during capacity leveling, for example, bottleneck planning.

More terms such as midpoint scheduling in Dictionary M.

Manual Meter Correction Factor:
Help calibration factor which helps determine or correct a meter reading (quantity), especially for pipeline and vehicle meters. The correction is necessary, because oil meters are not completely precise midpoint scheduling definition.
Manual Master Bill Of Lading:
Help contract between a sold-to party and a transportation service provider in collective goods traffic. A master bill of lading contains multiple bills of lading from one or more ship-from parties that midpoint scheduling explain.
Manual Main Usage Type:
Help the usage of properties or buildings from the asset accounting view. The main usage type determines the account determination for posting costs and revenues. If an asset is assigned to a property or midpoint scheduling what is.
Manual Missing Quantity (PP-MRP):
Help A quantity by which a requirement exceeds the available quantity midpoint scheduling meaning.
Manual More (CRM):
Help A button that is used to group several functions, for example, 'Send E-Mail', 'Follow-Up', 'Set to Completed' and 'Create Sales Call' midpoint scheduling abbreviation.
  • Dodano:
  • Autor: