MULTI-LEVEL CONTRACT title: multi-level contract (IS-AFS-MM) (SAP Library - Glossary)
MULTI-LEVEL CONTRACT category: Materials Management (IS-AFS-MM)
MULTI-LEVEL CONTRACT explained:
A structure in purchasing with several interdependent contracts based on an AFS contract.
In order to block capacities at a vendor early on, an AFS contract for diverse materials of one material group is created in an early planning phase. With reference to this AFS contract, further value and quantity contracts can be created at a later time, which contain detailed information at material level or SKU level.
More terms such as multi-level contract in Dictionary M.
- Manual Maintenance Variant:
- Help defined in the change master record. If you process a change object with reference to a change master record in which you have saved a maintenance variant, the system automatically displays the the multi-level contract definition.
- Manual Maintenance Plan Type:
- Help you use to define the type of maintenance plan. Maintenance plan types can be: Time-based maintenance plans (key date, factory calendar) Performance-based maintenance plans Multiple counter plans multi-level contract explain.
- Manual Material Confirmation:
- Help A means to report the material consumption for a service order. This includes planned and unplanned material consumption for the service order multi-level contract what is.
- Manual Master Data Template Category:
- Help to create the master data templates supplied by SAP. The master data template category defines the maximum number of fields that can be used in a given master data template. Example: Business partner multi-level contract meaning.
- Manual Meter Reading Interval:
- Help only one meter reading and the related billing are to be carried out. The meter reading interval is entered in the meter reading unit. If there is already a meter reading order or result in the multi-level contract abbreviation.