PEGGING RELATIONSHIP title: pegging relationship (SCM-APO-PPS) (SAP Library - Glossary)
PEGGING RELATIONSHIP category: Production Planning and Detailed Scheduling (SCM-APO-PPS)
PEGGING RELATIONSHIP explained:
Connection between the receipt element and issue element of a product in a pegging structure.
The receipt/issue quantities of a product can differ from one another. In this case, a requirement has to be covered by several receipt elements or an order can cover several requirements. This means that a requirement is connected with several receipt elements by means of pegging or that an order is connected with several issue elements.
More terms such as pegging relationship in Dictionary P.
- Manual Personnel Structure:
- Help A description of the employee's position in a company. There is an administrative perspective and an organizational perspective of the personnel structure pegging relationship definition.
- Manual Possible Entries:
- Help function used to display the valid input values for a field. To display the possible entries for a field, you either position the cursor on the field and select F4 or select the Possible entries pegging relationship explain.
- Manual Processing Control:
- Help logic and control of the processing steps during the various processes of combined settlement. The processing control depends on the following parameters: Processing status of a process object Caller pegging relationship what is.
- Manual Planning Material:
- Help is required in the planning strategy planning with planning material. Non-variable parts for similar finished products can be planned using this strategy. The planning material is then assigned to pegging relationship meaning.
- Manual Production Planning Run:
- Help background planning with heuristics or planning functions. In a production planning run, you can execute different kinds of planning successively; for example, first planning according to MRP logic pegging relationship abbreviation.