PER-PROJECT VIEW title: per-project view (XAP-OSP) (SAP Library - Glossary)
PER-PROJECT VIEW category: Office Suite Program (XAP-OSP)
PER-PROJECT VIEW explained:
A view in time tracking that displays all events in a table, grouped by project code.
The per-project view enables you to sort events by project code and duration.
More terms such as per-project view in Dictionary P.
- Manual Preventive Maintenance (PM):
- Help The tasks that are performed in Plant Maintenance to maintain the target condition (preventive maintenance) and to determine the condition (inspection) of a technical system per-project view definition.
- Manual Premium Formula (PT):
- Help incentive wages to calculate results for a specific day, period, or time ticket. The result is a labor utilization rate but can also be a fixed amount. The premium formula also controls various per-project view explain.
- Manual Product Model (FS-PM):
- Help of all information about a product. It shows a schedule that defines how the data for the product to be described is to be structured, and the relationships. The product model consists of a number of per-project view what is.
- Manual PP Value:
- Help or quantities (known generally as: Values) reported in a usage confirmation can refer to the total value since the contract start (ITD value: inception to date) or the respective period (PP value per-project view meaning.
- Manual PRT Bridge Service:
- Help A service that contains all PRT functions and services relying on a specific J2EE Engine implementation per-project view abbreviation.