PLAN NUMBER title: plan number (FS-MCM-PDM) (SAP Library - Glossary)
PLAN NUMBER category: Payment Distribution and Monitoring (FS-MCM-PDM)
PLAN NUMBER explained:
Master contract number of a master contract with the feature "Payment Distribution and Monitoring".
More terms such as plan number in Dictionary P.
- Manual Packing Proposal With Closed Packing:
- Help Special packaging material: closed packaging for materials that require such packaging plan number definition.
- Manual Period Management:
- Help commission contracts different versions. All versions of a commission contract are managed on the basis of periods. A clerk can access any version of a contract at any time. The effective and plan number explain.
- Manual Power Factor Adjustment Ratio:
- Help Adjustment ratio determined by comparing the power factor specified in the contract with the calculated power factor (cosine phi plan number what is.
- Manual Pack:
- Help A function used in XML Data Archiving to compress and bundle archived documents called resources plan number meaning.
- Manual Planned Rate:
- Help A control parameter for takt-based scheduling in sequencing. The planned rate is the quantity for each time unit that you can produce for a specific period on a production line plan number abbreviation.