PLANNED DATA title: planned data (LE) (SAP Library - Glossary)
PLANNED DATA category: Logistics Execution (LE)
PLANNED DATA explained:
The calculated default data for processing WM transfer orders.
This data includes:
Volume Weight Transfer order processing timeThe planned TO processing time is the target time or the time that is expected (planned) for a worker to process an entire transfer order with one or several items.
More terms such as planned data in Dictionary P.
- Manual Posting Object:
- Help The posting object is an element of the budget structure. It is the fund, funds center, and commitment item combination to which postings can be made planned data definition.
- Manual Product (CO-PC):
- Help A product to be costed that corresponds to the top level of an assembly in manufacturing planned data explain.
- Manual Performance Data (BC-DWB-TOO):
- Help from a performance trace or runtime analysis. When you execute a transaction or an ABAP report under control of the performance trace or runtime analysis, the resulting performance data is written to planned data what is.
- Manual Progress Status Setting:
- Help A method for sales managers to analyze at a glance how quickly an opportunity is moving through the pipeline planned data meaning.
- Manual Posting Change Notice:
- Help notices are created in the WM system as a result of a transfer posting in the Inventory Management system. They contain information that identifies the material number, quantity, movement type, and planned data abbreviation.