term interval planning help what is
Meaning of planning interval. What is it: Outside of this period the resource is fixed and cannot.

Helpful?

Definition planning interval

PLANNING INTERVAL title: planning interval (SCM-APO-PPS) (SAP Library - Glossary)
PLANNING INTERVAL category: Production Planning and Detailed Scheduling (SCM-APO-PPS)
PLANNING INTERVAL explained:

Period during which the resource can be used in planning. Outside of this period the resource is fixed and cannot be used in planning.

More terms such as planning interval in Dictionary P.

Manual Personnel Change Request:
Help that a manager sends to the Human Resources department to request that the personnel data (such as working time information or salary data) for an employee within his or her area of responsibility be planning interval definition.
Manual Posting Key Figure:
Help that is defined in the key figure repository of Bank Analyzer for a posting key figure class, and is derived from the posting key figure type in Balance Analyzer. The posting key figure is determined planning interval explain.
Manual Price Content Component Hierarchy:
Help describes relationships between content components in terms of price. Structures of publications or websites are reproduced in a price content component hierarchy. This allows the system to determine planning interval what is.
Manual Production Model:
Help of iPPE structures that are contained in a production version into a business object. The business object production model consists of the product structure, process structure, factory layout, and planning interval meaning.
Manual Period Control Method:
Help that controls what assumptions the system makes when revaluating asset transactions that are posted partway through a period. Using the period control method, for example, you can instruct the system planning interval abbreviation.
  • Dodano:
  • Autor: