PLANNING PERIOD (PA-CM) title: planning period (PA-CM) (SAP Library - Glossary)
PLANNING PERIOD (PA-CM) category: Compensation Management (PA-CM)
PLANNING PERIOD (PA-CM) explained:
A period for which compensation adjustments are planned and within which they become effective.
More terms such as planning period (PA-CM) in Dictionary P.
- Manual Personnel Cost Savings:
- Help personnel costs expected (financing) - that is, the costs the system determined in the last commitment run - are lower than the financing items that existed before the last commitment run planning period (pa-cm) definition.
- Manual Partner-Dependent Product Data:
- Help The number and description that a business partner uses to identify a product planning period (pa-cm) explain.
- Manual Production Order (SBO):
- Help An order that initiates the manufacturing process in SAP Business One planning period (pa-cm) what is.
- Manual PI-PCS Interface:
- Help interface enabling integration between external process control systems and the SAP system. Control recipes from the SAP system are sent to the process control system via the PI-PCS interface. After planning period (pa-cm) meaning.
- Manual Process Material:
- Help represents the manufacture of co-products. A process material is not a physical entity. It represents a production process. When manufacturing co-products, you can use process materials as the header planning period (pa-cm) abbreviation.