PLANNING-RELATED OFFSET title: planning-related offset (SCM-APO-PPS) (SAP Library - Glossary)
PLANNING-RELATED OFFSET category: Production Planning and Detailed Scheduling (SCM-APO-PPS)
PLANNING-RELATED OFFSET explained:
Determines the time interval between the requirement (input node) and the start of the activity in project manufacturing during scheduling with planning-related minimum intervals.
The planning-related offset provides the planner with leeway in planning.
In scheduling with heuristics, the planner can use the planning-related offset to increase the interval between the requirement and the start of the activity.
The planning-related offset must lie before the offset, which is stored in the master data as the 'process-related' offset.
More terms such as planning-related offset in Dictionary P.
- Manual Pooled Sample:
- Help Physical sample that is formed from primary samples planning-related offset definition.
- Manual Product Model (LO):
- Help Objects belonging to a product, such as materials, bills of material, documents, classes, characteristics, classifications, and the configuration model planning-related offset explain.
- Manual Process Material:
- Help represents the manufacture of co-products. A process material is not a physical entity. It represents a production process. When manufacturing co-products, you can use process materials as the header planning-related offset what is.
- Manual Performance:
- Help A measure of the efficiency of a data processing system planning-related offset meaning.
- Manual Portfolio Item (XAP-RPM):
- Help Any of the supported base system types managed in the portfolio. Examples of portfolio items include project proposals, projects, ideas, concepts, and products planning-related offset abbreviation.