term previous standard cost what is
Meaning of previous standard cost estimate. What is it: price before the standard price was changed.

Helpful?

Definition previous standard cost estimate

PREVIOUS STANDARD COST ESTIMATE title: previous standard cost estimate (CO-PC) (SAP Library - Glossary)
PREVIOUS STANDARD COST ESTIMATE category: Product Cost Controlling (CO-PC)
PREVIOUS STANDARD COST ESTIMATE explained:

The material cost estimate that established the standard price before the standard price was changed.

More terms such as previous standard cost estimate in Dictionary P.

Manual Planning Variance:
Help arises in the planning stage. The planning variance can be calculated by comparing the target costs calculated in the standard cost estimate for the material to the planned costs for a manufacturing previous standard cost estimate definition.
Manual Production Bill Of Material:
Help that describes the components used to manufacture a finished or semi-finished product. In contrast to a sales or assembly bill of material, the production bill of material is generated after creating previous standard cost estimate explain.
Manual Preliminary Plan:
Help The estimated cost and deadlines, as well as the resources, planned for the project phases and work packages in the R/3 procedure model previous standard cost estimate what is.
Manual Probability Of Acceptance:
Help The likelihood that an inspection lot will be approved, when using a given sampling plan, The probability of acceptance depends on the quality of the inspection lot previous standard cost estimate meaning.
Manual Planning Hierarchy (PP):
Help combination of characteristics from an information structure that is used in Sales ; Operations Planning. It allows top-down and bottom-up planning and the integration of centralized and previous standard cost estimate abbreviation.
  • Dodano:
  • Autor: