PRODUCTION PLANNING RUN title: production planning run (SCM-APO-PPS) (SAP Library - Glossary)
PRODUCTION PLANNING RUN category: Production Planning and Detailed Scheduling (SCM-APO-PPS)
PRODUCTION PLANNING RUN explained:
Execution of background planning with heuristics or planning functions.
In a production planning run, you can execute different kinds of planning successively; for example, first planning according to MRP logic for selected products, and then sequence optimization on the relevant bottleneck resources.
More terms such as production planning run in Dictionary P.
- Manual Prioritization Horizon:
- Help Number of days over which the system takes into account and prioritizes existing deployment stock transfers production planning run definition.
- Manual Product (ICM):
- Help Sales product defined by marketing. A product may either be made up of several tariffs or allows special conditions on the basis of existing tariffs or is calculated on its own production planning run explain.
- Manual Physically Withdrawn Quantity:
- Help Quantity at supply area which has already been physically used but which has not yet been received in the logical stock production planning run what is.
- Manual Priority (BC-BMT-WFM):
- Help urgency of work items. The priority of a work item is defined in the step definition. The recipients of work items with the priority 1 are informed in an express dialog box. The Business Workplace production planning run meaning.
- Manual Planning Interval:
- Help Period during which the resource can be used in planning. Outside of this period the resource is fixed and cannot be used in planning production planning run abbreviation.