REPLENISHMENT LEAD TIME title: replenishment lead time (PP-MRP) (SAP Library - Glossary)
REPLENISHMENT LEAD TIME category: Material Requirements Planning (PP-MRP)
REPLENISHMENT LEAD TIME explained:
The total time for the in-house production or for the external procurement of a product.
In in-house production, the replenishment lead time is determined to cover all BOM levels.
More terms such as replenishment lead time in Dictionary R.
- Manual Reduction Factor (SCM-APO-ATP):
- Help in interactive backorder processing. The previously-confirmed quantity can be multiplied and therefore reduced by the factor specified for selected requirements in interactive backorder processing replenishment lead time definition.
- Manual Route Connection:
- Help The connection between two hosts over a network. The route is the sequence of intermediary points through which the connection is established replenishment lead time explain.
- Manual Recycled Family Item:
- Help An item created when a family is deleted to save the family data and layout information. The information is stored in the recycle bin replenishment lead time what is.
- Manual Request Owner:
- Help The user to which a change request is assigned. The request owner is authorized to process the change request replenishment lead time meaning.
- Manual Responsibility (IS-R):
- Help Identification of the person responsible for assigning an article hierarchy node replenishment lead time abbreviation.