SCHEDULING PERIOD title: scheduling period (PM) (SAP Library - Glossary)
SCHEDULING PERIOD category: Plant Maintenance (PM)
SCHEDULING PERIOD explained:
A period of time for which the system creates maintenance calls when scheduling a maintenance plan.
The scheduling period can be specified in days, months, and years.
Example
When scheduling a maintenance plan, for which calls are created for a year, the scheduling period must be 365 days.
More terms such as scheduling period in Dictionary S.
- Manual Segregation:
- Help The description of physical separation of dangerous goods and other goods, in particular other dangerous goods. Example Away from Not above scheduling period definition.
- Manual Segmentation (ICM):
- Help splitting up a portfolio according to certain assigning criteria. Segments are the result of this activity. Example Segmenting a portfolio according to product-related assigning criteria Motor scheduling period explain.
- Manual Subclaim:
- Help claim into units that can be processed independently. Each subclaim can comprise a (sub)claim within the overall claim, for example. A new subclaim is opened for each claimant and coverage, and in scheduling period what is.
- Manual Settlement Indicator:
- Help An indicator that controls whether ETM basic data and settlement data for the appropriate recipient, standard recipient or dummy recipient is used in settlement (3-level hierarchical access scheduling period meaning.
- Manual SAP For Engineering & Construction:
- Help suite of integrated e-business solutions designed to meet the specific needs of the engineering and construction industry. This solution handles the full range of business processes for the industry scheduling period abbreviation.