SCHEDULING STRATEGY title: scheduling strategy (CRM-RPL) (SAP Library - Glossary)
SCHEDULING STRATEGY category: Resource Planning for Personnel Resources (CRM-RPL)
SCHEDULING STRATEGY explained:
A way of describing how scheduling should be performed in the Resource Planning Tool.
There are two different scheduling strategies:
The user determines the start and end time of an assignment. After a start or end date has been set, the system determines a suitable start or end time with reference to the employee time streamMore terms such as scheduling strategy in Dictionary S.
- Manual Staffing Action:
- Help Client customizable attribute used for marking a resource as a candidate for a demand scheduling strategy definition.
- Manual Single-Value Characteristic:
- Help product modeling and configuration, which can only have one characteristic value at a time. Example The characteristic 'processor' in PC configuration: The user of interactive scheduling strategy explain.
- Manual System Setting (BC-CTS):
- Help SAP system group setup within the SAP System scheduling strategy what is.
- Manual Surety:
- Help India, that the excise department requires from some exporters when they apply for an excise bond. Whether or not a surety is required is at the discretion of the excise department. A surety is in scheduling strategy meaning.
- Manual Stability Study:
- Help the effects of various conditions, such as temperature, moisture, and brightness, on a product and its properties over a specified period of time. In the course of a stability study: Physical samples scheduling strategy abbreviation.