TAKT-BASED SCHEDULING (PP-FLW) title: takt-based scheduling (PP-FLW) (SAP Library - Glossary)
TAKT-BASED SCHEDULING (PP-FLW) category: Flow Manufacturing (PP-FLW)
TAKT-BASED SCHEDULING (PP-FLW) explained:
Procedure for determining the production dates/times on the basis of the takt time and the number of takts.
In contrast to lead-time scheduling via the routing, takt-based scheduling is carried out not via the routing but on the basis of the following data:
Length of the production line, defined by the number of takts. Takt time/rate. These determine how long a material remains in each takt and in which time intervals a material enters and exits the production lineMore terms such as takt-based scheduling (PP-FLW) in Dictionary T.
- Manual Task-Panel Toolbar:
- Help The toolbar that enables you to display the various task panels takt-based scheduling (pp-flw) definition.
- Manual Table Body:
- Help actual internal table of internal tables with a header line. The table body is addressed by appending [] onto the table name (e.g. a field symbol or a dereferenced data reference variable). For takt-based scheduling (pp-flw) explain.
- Manual Time Pair:
- Help that are logically assigned to the same day. Time events are uploaded from a time recording terminal to the SAP system. Time pairs are formed so that time events can be processed in time evaluation takt-based scheduling (pp-flw) what is.
- Manual Test Temperature:
- Help The temperature at which the test density was measured. It is used with the test density to calculate the base density (the density at standard temperature takt-based scheduling (pp-flw) meaning.
- Manual Type (BC-ABA):
- Help Abstract description of an object. Either a data type for data objects or an object type for objects in ABAP Objects. The corresponding generic data type is any. All types are in a common namespace takt-based scheduling (pp-flw) abbreviation.