A version that determines the basis for the calculation of target costs.
Target costs are used as a reference base when:
Splitting the actual costs posted to a cost center to the individual activity types Splitting the actual costs posted to a cost object hierarchy to the individual products Calculating variances for a cost center, an order, or a cost object hierarchyMore terms such as target cost version in Dictionary T.
- Manual Test Cycle:
- Help An operational cycle consisting of the following operational phases: 1. Tagging phase 2. Temporary untagging phase target cost version definition.
- Manual Throughput Agreement:
- Help transporting material between two company-owned locations using a pipeline etc. owned by another company or legal entity. For the purpose of the movement, the material is sold to the owner of the target cost version explain.
- Manual Time Series Data Area:
- Help used to store time series for a time series data type. The validity of a time series data area is restricted by the relevant time series data type that describes the technical structure of the time target cost version what is.
- Manual Time Slot (IS-U-WM):
- Help Time period in minutes for which an appointment can be scheduled. You can set the start time and length of a time slot in Customizing target cost version meaning.
- Manual Technical Reference Object:
- Help service is carried out. CRM contains connection objects, connections and points of delivery replicated from the IS-U data model. Both the IS-U contracts and service management (from the Plant target cost version abbreviation.