TEST CYCLE title: test cycle (PM-WCM) (SAP Library - Glossary)
TEST CYCLE category: Work Clearance Management (PM-WCM)
TEST CYCLE explained:
An operational cycle consisting of the following operational phases:
1. Tagging phase
2. Temporary untagging phase
More terms such as test cycle in Dictionary T.
- Manual Table (BC-DWB-DIC):
- Help Tabular array of data in the ABAP Dictionary. A table consists of columns (data values of the same type) and rows (data records). Each record can be identified uniquely by one or several fields test cycle definition.
- Manual Table-Specific Fallback Code Page:
- Help conversion to Unicode. Code page which can be set manually for an individual table. The conversion tool will use the table-specific Fallback Code Page for the conversion of this table, whenever test cycle explain.
- Manual Tax Deducted At Source:
- Help The term used, in India, for any form of withholding tax test cycle what is.
- Manual Transition (CRM-MD-PRO-OBJ):
- Help between two states indicating that an individual object in the first state (From State) may perform a certain action and enter the second state (To State) when the specified event occurs and test cycle meaning.
- Manual Time Profile (BC-CCM):
- Help Analysis view of the workload monitor that displays the temporal distribution of transaction steps over a day. The time profile enables you to identify periods of high and low workload test cycle abbreviation.