TIME ALLOCATION title: time allocation (CRM-RPL-SRV) (SAP Library - Glossary)
TIME ALLOCATION category: Service Resource Planning (CRM-RPL-SRV)
TIME ALLOCATION explained:
Describes the date and time boundaries of an event that impacts scheduling for the person, group, or organization. For example, Meeting from 09:00 to 12:00; Overtime from 17:00 to 21:00; Vacation from 01.08.04 to 15.08.04.
More terms such as time allocation in Dictionary T.
- Manual Top-Level Navigation Bar:
- Help The two horizontal bands below the header area at the top of the screen time allocation definition.
- Manual Temporary Object:
- Help is created during an availability check in APO. A distinction is made between the following types: temporary quantity assignment This is written for the individual basic methods that are called in time allocation explain.
- Manual Takt-Based Scheduling (AP-PPE):
- Help scheduling for takt-based production lines. The system calculates the lead time of an order not from the duration of the activities, but by multiplying the number of takts on a line with the takt time allocation what is.
- Manual Toolbar (BC-ABA):
- Help Name for the standard toolbar in the ABAP Workbench time allocation meaning.
- Manual Temporary Storage Facility:
- Help A place at which waste is collected, preliminarily treated, grouped for disposal, or stored time allocation abbreviation.