TIME QUOTA title: time quota (PT) (SAP Library - Glossary)
TIME QUOTA category: Personnel Time Management (PT)
TIME QUOTA explained:
A time interval during which employees can be at work or absent, under certain conditions.
More terms such as time quota in Dictionary T.
- Manual Trip Schema:
- Help dialog control and central field control in Travel Expenses The trip schema ensures that the different entry types correspond with the respective trip type (such as, several-day international trip time quota definition.
- Manual Transshipment Location:
- Help Location at which the goods are loaded from one vehicle to another; for example, a distribution center in the case of cross-docking time quota explain.
- Manual Time-Dependent Project Version:
- Help A project version that the user generates manually at a point in time time quota what is.
- Manual Topic (EP-PIN-PSL):
- Help assigned to a logical unit, such as a J2EE application, portal application, role, workset, page or iView. A topic may be mapped to a cluster zone to implement workload distribution. Technically this time quota meaning.
- Manual Task List Scenario:
- Help Planning scenario based on the cost simulation of task lists. The task list scenario is a component of the zero-based budgeting method time quota abbreviation.