term record requirements help what is
Meaning of requirements record. What is it: requirement type such as requirements on working days.

Helpful?

Definition requirements record

REQUIREMENTS RECORD title: requirements record (PT) (SAP Library - Glossary)
REQUIREMENTS RECORD category: Personnel Time Management (PT)
REQUIREMENTS RECORD explained:

A detailed definition of a requirement based on a requirement type such as "requirements on working days."

A requirements record can include the following information:

Shift, daily work schedule or individual time specifications Target, minimum, or maximum number of employees for a shift Employee job description Employee qualifications

More terms such as requirements record in Dictionary R.

Manual Relocation Planning (IS-DFS):
Help The process of assigning force elements and dependent objects to relocations and relocation steps requirements record definition.
Manual Replacement Strategy:
Help Modeling A supersession strategy describes supersession in terms of the cardinality of the sucessor product(s) in combination with the link category. The link category describes whether several requirements record explain.
Manual Resource Overload:
Help situation, in which the operations scheduled for a resource exceed the capacity of that resource. Resource overloads can frequently be tolerated in planning, as long as they do not exceed specific requirements record what is.
Manual Reports:
Help extensive SAP Business One system module used for analyzing business activities. It includes the following reports: Business reports Accounting reports Warehouse reports Financial reports Account requirements record meaning.
Manual Reduction (PP):
Help lead time of a routing, order, or network in scheduling. If the basic dates specified cannot be respected, the system takes reduction measures. Reduction measures are performed in steps. The requirements record abbreviation.
  • Dodano:
  • Autor: