RESOURCE (CO-PC) title: resource (CO-PC) (SAP Library - Glossary)
RESOURCE (CO-PC) category: Product Cost Controlling (CO-PC)
RESOURCE (CO-PC) explained:
A tool that, together with the item category, describes what an item in a cost estimate represents.
Examples of resources in cost estimates:
Materials Activity types Purchasing info records OverheadMore terms such as resource (CO-PC) in Dictionary R.
- Manual Rule Set (FS-PE):
- Help Certain number of rules that are used according to a defined hierarchy to assign a payment item to a routing, for example resource (co-pc) definition.
- Manual Result Group Versioning:
- Help that is used in the Basel II environment to store results, whose values are generated more than once for the same key date during different runs. In each run, a separate result group is used that is resource (co-pc) explain.
- Manual Route Connection:
- Help The connection between two hosts over a network. The route is the sequence of intermediary points through which the connection is established resource (co-pc) what is.
- Manual Relational Data Model:
- Help data model, data is represented in two dimensional tables (relations) with a fixed number of columns and any number of rows. Rows that are paired differ from one another. The order of the rows and resource (co-pc) meaning.
- Manual Reversal Document:
- Help A document that is generated when reversing a posting resource (co-pc) abbreviation.