RESOURCE TYPE (CO-OM-CCA) title: resource type (CO-OM-CCA) (SAP Library - Glossary)
RESOURCE TYPE (CO-OM-CCA) category: Cost Center Accounting (CO-OM-CCA)
RESOURCE TYPE (CO-OM-CCA) explained:
A statement of whether a resource references other organizational units.
Resource types and their meanings:
Type R - The resource is used only in Overhead Cost Controlling (CO-OM). Type B - The resource references a base planning object. Type M - The resource references a material. Type F - The resource references a purchasing info recordMore terms such as resource type (CO-OM-CCA) in Dictionary R.
- Manual Remaining Term:
- Help The time period between today's date and the due date of a transaction and/or payment flow resource type (co-om-cca) definition.
- Manual RFC Adapter:
- Help Adapter used to connect SAP components to an Integration Server by using remote function calls (RFCs resource type (co-om-cca) explain.
- Manual Ramping:
- Help Step-by-step reduction of a fixed demand or a fixed receipt resource type (co-om-cca) what is.
- Manual Resource Overload:
- Help situation, in which the operations scheduled for a resource exceed the capacity of that resource. Resource overloads can frequently be tolerated in planning, as long as they do not exceed specific resource type (co-om-cca) meaning.
- Manual Result Group:
- Help An identifier for a number of associated results. The Results Data Layer provides status management and versioning at result group level resource type (co-om-cca) abbreviation.