RISK MATRIX title: Risk Matrix (SV-ASA) (SAP Library - Glossary)
RISK MATRIX category: ASAP (AcceleratedSAP) (SV-ASA)
RISK MATRIX explained:
In the SAP Review Program, a document presenting each finding of the Review Team in a matrix, in which one axis is "Influence on the project"and the other axis is "Grade of difficulty."
There are the following types of risks:
High risk - Refers to a significant unresolved or unrecognized issue, with a relatively high probability that a problem will occur unless corrective action is taken. Medium risk - This item will cause problems; however, the potential severity is moderate, the probability of the problem occurring is relatively low, or the issue has been recognized and corrective actions are underway. Low risk - Item is under control, with little concern that problems will arise. No corrective action is required.More terms such as Risk Matrix in Dictionary R.
- Manual Run Schedule Quantity:
- Help are manufactured in a certain period. Run schedule quantities are created as planned orders. Unlike other planned orders, RS quantities do not have to be released and converted to production orders risk matrix definition.
- Manual Rig Schedule:
- Help A document that lists the sequence and type of materials to be used during a drilling activity risk matrix explain.
- Manual Reserve (ICM):
- Help monetary portion of commission that is not immediately disbursed to the commission recipient. The reserve is a special type of retention that retains a percentage share of the commission. Reserves risk matrix what is.
- Manual Reference Partner:
- Help Leading insurance company, with which the agreement for coinsurance has been made. This is only relevant for the Participation and Participation PT coinsurance types risk matrix meaning.
- Manual Reporting (CO):
- Help The set of all reports for an organization, including the rules for creating and distributing such reports risk matrix abbreviation.