COST OVERRUN (CO-PC) title: cost overrun (CO-PC) (SAP Library - Glossary)
COST OVERRUN (CO-PC) category: Product Cost Controlling (CO-PC)
COST OVERRUN (CO-PC) explained:
The amount by which the actual costs exceed the planned costs.
More terms such as cost overrun (CO-PC) in Dictionary C.
- Manual Checkpoint Group:
- Help that serves the grouping and activation of checkpoints that can be activated. The creation of checkpoint groups, and the maintenance of the activation settings of checkpoint groups, take place using cost overrun (co-pc) definition.
- Manual Currency Barrier Option:
- Help defined by an upper limit (Instrike) or a lower limit (Outstrike). In this way it differs from the conventional over-the-counter (OTC) option. If the market exceeds or falls below these limits, the cost overrun (co-pc) explain.
- Manual Collection Strategy:
- Help prioritization of collection rules For collecting receivables with component SAP Collections Management , a collection specialist's worklist is created based on a collection strategy cost overrun (co-pc) what is.
- Manual Constraint Reference Type:
- Help Reference type that indicates which relationship between predecessor and successor activities is used as the basis for the minimum or maximum interval between activities cost overrun (co-pc) meaning.
- Manual Charge Factor Value:
- Help Valuation relation of a charge factor to the local currency when charging for services cost overrun (co-pc) abbreviation.