DISCONTINUATION GROUP title: discontinuation group (PP-MRP) (SAP Library - Glossary)
DISCONTINUATION GROUP category: Material Requirements Planning (PP-MRP)
DISCONTINUATION GROUP explained:
The grouping of related items in a BOM that are discontinued together.
You can only assign a material component to a discontinuation group in a BOM if the settings in the material master record allow this.
A discontinued item is replaced by a follow-up item.
More terms such as discontinuation group in Dictionary D.
- Manual Design Time Repository:
- Help Versioning source repository from SAP. The DTR is based on a file and folders paradigm and uses standard protocols (HTTP, DAV, DeltaV) for access discontinuation group definition.
- Manual Disaggregation (SCM-APO-FCS):
- Help key figure value on a high level is automatically broken down to the detailed level. For example, if you forecast demand in a particular region, the system instantly splits up this number among the discontinuation group explain.
- Manual Delivery Driver:
- Help Person who delivers goods but does not take orders discontinuation group what is.
- Manual Date Cost Incurred:
- Help The date on which a cost is incurred, for which an employee claims reimbursement from a flexible spending account discontinuation group meaning.
- Manual Drug Prescription:
- Help a prescription drug. A pharmacy dispenses the drug and adds price details to the drug prescription. The drug prescription also serves as an invoice. In German statutory health insurance there is a discontinuation group abbreviation.