term stock project what is
Meaning of nonvaluated project stock. What is it: value of this inventory is calculated by results.

Helpful?

Definition nonvaluated project stock

NONVALUATED PROJECT STOCK title: nonvaluated project stock (CO-PC) (SAP Library - Glossary)
NONVALUATED PROJECT STOCK category: Product Cost Controlling (CO-PC)
NONVALUATED PROJECT STOCK explained:

An inventory of materials for processing a project.

The value of this inventory is calculated by results analysis at the end of the period.

More terms such as nonvaluated project stock in Dictionary N.

Manual Non-Stock Item:
Help The item category non-stock item is used if you enter a material as a component in a bill of material, and the material is not kept in stock. A purchase requisition is created for non-stock items nonvaluated project stock definition.
Manual Navigation Panel:
Help portal desktop that is expanded and collapsed and is dedicated to navigating content. It can contain the detailed navigation area, the Drag;Relate Targets area, and a Related Links area, all of which nonvaluated project stock explain.
Manual NM System:
Help Blood group classification system nonvaluated project stock what is.
Manual Notch Element:
Help A UI control (element) like a tab that has a small indentation on its edge nonvaluated project stock meaning.
Manual Net Actual Cost:
Help The actual cost less the work in process and scrap. The net actual cost is compared to the target cost to determine production variances and total variances nonvaluated project stock abbreviation.
  • Dodano:
  • Autor: